Project rendering of 120 Fifth Avenue as viewed from Fifth Avenue and Park Place space space space space space space space
Project Information
120 Fifth Avenue is a mixed-use development site in Park Slope, Brooklyn. Once completed, the 180-unit development will include:
- 45 affordable apartments
- A 25,000-square-foot community-oriented supermarket, operated by Lidl
- Approx. 42,000 square feet of additional retail/commercial space, including a CVS pharmacy, Wells Fargo bank branch and neighborhood retail
- A 139-space parking garage
- A publicly accessible pedestrian plaza connecting Butler Street with Fifth Avenue
Construction Hours
- Monday-Friday, 7:00am-6:00pm.
- Weekend work will be scheduled as needed, typically on Saturdays from 9:00am until 6:00pm.
- After-hours or Sunday work may be scheduled for public safety reasons or for the continuity of essential construction tasks (e.g., cement pours).
Construction Time Frame
The project’s construction team is committed to conducting work on the site in a manner that is responsible and respectful of the community while working to complete this project as expeditiously as possible and deliver the new supermarket and affordable housing units starting in 2025. We greatly appreciate the patience of our neighbors during construction.
Completed Work on Site
- Site demolition, excavation and pile driving
- South Building topped out; exterior envelope enclosure for South Building complete
- North Building superstructure work complete
- Installation of hoist, loading dock and construction gate on Baltic Street
- Removal of construction crane from site
- Limited tree trimming on Butler Street
- Removal of two street trees on 5th Avenue
- Relocation of fire hydrant on 5th Avenue
- Installation of sidewalk vaults on 5th Avenue for utility connections
Project rendering of publicly-accessible pedestrian plaza connecting Butler Street with Fifth Avenue (looking towards Fourth Avenue)
Upcoming Work on Site
- South Building interior work and façade nearing completion.
- Sidewalk shed at South Building to be removed by December.
- North Building interior work including mechanical / electrical / plumbing, installation of sheetrock and windows.
- Façade work continues on North Building.
- Electrical infrastructure work to continue through December.
- Sewer infrastructure work to begin in October and continue through mid-November.
- Work to complete publicly-accessible pedestrian plaza will begin.
Construction Effects
In October, November, and December, you can expect the following:
- Modified pedestrian paths on 5th Avenue and Baltic Street adjacent to the site will allow necessary infrastructure and site work. Signage has been installed to direct pedestrians around the site.
- The changes in pedestrian pathways resulted in the temporary removal of street parking on the west side of 5th Avenue between Sterling Place and Baltic Street, and on Baltic Street between 5th Avenue and Gregory Place.
- Changes to pedestrian paths and parking on 5th Avenue and Baltic Street to remain through end of 2024.
- Temporary partial traffic lane closures on 5th Avenue to allow electrical and sewer infrastructure work to proceed.
- Truck deliveries within hours of operation. Our team has instructed truck drivers to park only where permitted; not to park in bus stops or crosswalks; not to block deliveries to local businesses or residential driveways; and to follow all applicable NYC regulations regarding idling. Our team will endeavor to minimize the impact of truck traffic.
- Construction vehicles will access the site via vehicular gates on Fifth Avenue, Baltic Street and Gregory Place. Flagmen will be present to help ensure pedestrian safety as vehicles enter & exit the site.
If you have questions regarding this work, please call the 120 Fifth Avenue construction hotline at (347) 773-1174 or send an email to [email protected].
Sign up to receive periodic construction updates at 120fifthavenuebk.com