October / November / December 2023

Project rendering of 120 Fifth Avenue as viewed from Fifth Avenue and Park Place space space space space space space space

Project Information

120 Fifth Avenue is a mixed-use development site in Park Slope, Brooklyn. Once completed, the 180-unit development will include:

  • 45 affordable apartments
  • A 25,000‐square‐foot community-oriented supermarket
  • Approx. 42,000 square feet of additional retail/commercial space, including a CVS pharmacy, Wells Fargo bank branch and neighborhood retail
  • A 130-space below-grade parking garage
  • A publicly accessible pedestrian plaza connecting Butler Street with Fifth Avenue

Construction Hours

  • Monday-Friday, 7:00am-6:00pm.
  • Weekend work will be scheduled as needed, typically on Saturdays from 9:00am until 6:00pm.
  • After-hours or Sunday work may be scheduled for public safety reasons or for the continuity of essential construction tasks (e.g., cement pours).

Construction Time Frame

The project’s construction team is committed to conducting work on the site in a manner that is responsible and respectful of the community while working to complete this project as expeditiously as possible and deliver the new supermarket and affordable housing units by 2024. We greatly appreciate the patience of our neighbors during construction.

Completed Work on Site

  • Site demolition, excavation and pile driving
  • Foundation work for North and South Buildings
  • Cement poured for first and second floors of South Building
120 Fifth Avenue rendering

Project rendering of publicly-accessible pedestrian plaza connecting Butler Street with Fifth Avenue (looking towards Fourth Avenue)

Upcoming Work on Site

  • Delivery and assembly of a construction crane is anticipated in November. The temporary closure of Butler Street between 4th Ave and Gregory Place will be required.
  • Delivery and installation of steel plinth beams
  • Prefabricated metal stud walls delivered to site
  • As walls are assembled and installed, decking and concrete will be used to construct each floor
  • Completion of South Building structure expected in November; interior work on South building begins

Construction Effects

In October, November, and December, you can expect the following:

  • Delivery and assembly of a construction crane in November. The temporary closure of Butler Street between 4th Ave and Gregory Place will be required during the delivery and assembly of the crane. Notices of the temporary street closure and “No Parking” signs will be publicly posted 48 hours in advance of the scheduled crane delivery. NYC DOB will be on-site during the crane assembly.
  • Limited tree trimming on Butler Street was required by the NYC Parks Department, which determined that certain branches might be damaged by the hoisting of the crane. The work was done in accordance with Parks Department standards, which require a certified arborist on-site at the time of pruning and prohibit excessive pruning. The Parks Department will review the work once completed.
  • Truck deliveries within hours of operation. Our team has instructed truck drivers to park only where permitted; not to park in bus stops or crosswalks; not to block deliveries to local businesses or residential driveways; and to follow all applicable NYC regulations regarding idling. Our team will endeavor to minimize the impact of truck traffic around the site.
  • Temporary sidewalk sheds to establish pedestrian paths and promote safety.
  • Street parking is available on the west side of Gregory Place. The east side of Gregory Place (adjacent to site) is a “No Parking” zone.
  • Construction vehicles will access the site via vehicular gates on Fifth Avenue and Gregory Place. Flagmen will be present to help ensure pedestrian safety as vehicles enter and exit the site.
  • Seismic monitors on and around the site will report and track vibrations from construction activity in real time and ensure that all activity is within legally allowed limits.

If you have questions regarding this work, please call the 120 Fifth Avenue construction hotline at (347) 773-1174 or send an email to [email protected].